EPBM Systems Product Guide0 pages
Many cutter head configurations are available for The pipe jacking EPBM control console is located Spoils are mixed with foam and slurry to ease in
nnnnoptimum soil displacement from the EPBM face. inside the tunnel where operators have full excavation.
nnnncontrol over all functions.The screw conveyor
nnnnadvances spoils into the haul unit dirt bucket.
nnnnEARTH PRESSURE BALANCE SYSTEMS
nnnnThe Akkerman name has long been associated with industry
nnnnleading projects. Earth Pressure Balance Machine (EPBM)
nnnnsystems have furthered our project realm while offering
nnnncustomers a U.S. manufactured product with the same level
nnnnof reliability and service options that come with all of our
nnnnequipment.
nnnnThe pipe jacking EPBM excavates spoil by balancing the
nnnnmachine face pressure with the soil pressure, thus minimizing
nnnnground settlement. Spoils from the cutter chamber are mixed
nnnnwith foam and slurry to balance the face pressure and are
nnnnremoved through the screw conveyors and haul system.
nnnnOperators, in a control console, guide the machine and monitor
nnnntargeting data, pressures, positions, speed, torque and flow
nnnnto pilot an accurate course. A hydraulic jacking frame in the
nnnnlaunch shaft advances the machine and when retracted, a new
nnnnpipe section is inserted. Many custom cutter tools and drag bit
nnnnconfigurations are available for the mixed face or soft ground
nnnnbi-directional cutter head.
nnnnstation, segment handling, hydraulics, VFD, transformers, and
nnnnblower cars.
nnnnAkkerman EPBM systems, complex in design and performance,
nnnnare custom built to suit project demands. We work closely
nnnnwith our customers, thoroughly analyzing the project and
nnnnrecommending a system, to complete the job efficiently and
nnnnon budget.
nnnnThesegmenterecting EPBM is custom builttojobspecifkations.
nnnnThe main distinction between the pipe jacking EPBM and those
nnnndesigned for segment erecting is the machine's capability to
nnnninstall concrete segments, curved tunnels and extended drive
nnnnlengths.The spoil removal process through a screw conveyor is
nnnnessentially the same as other pipe jacking applications. A series
nnnnof back-up cars follow behind the EPBM, housing the operator
nnnnMany specialized back-up cars are needed to
nnnnperform the complex operations of the segment
nnnnerecting EPBM.
nnnnThe segment erector places tunneling segments The control console car is where the operator
nnnnin the appropriate position then the EPBM monitors and adjusts all EPBM functions.
nnnnadvances off of the tunnel to move forward.
"