Haruvit (Israel) KA26 combined cycle power plant0 pages
CASE STUDY: GAS PRODUCT SOLUTIONS
Haruvit – Israel
KA26 combined-cycle power plant
Alstom to construct the
biggest power project ever
executed in Israel by an
IPP
Alstom has won an EPC (Engineering, Procurement and Construction) contract with
Dalia Power Energies Ltd to build the 834 MW Haruvit power plant in Israel. The
project represents Alstom’s first entry into the Israeli gas market under a full EPC
contract and will be the country’s largest privately-owned power station.
The power plant is located near Kfar Menachem, 40 km south-east of Tel Aviv. The
834 MW provided to the national grid by the Haruvit Power Plant corresponds with
about 7% of the country’s current installed power generation capacity. The location of
the Haruvit Power Plant at the intersection of the national electricity grids will enable
feeding electricity to both the grid’s northern and southern sections, increasing the
reliability of electricity supply to end users.
The EPC contract covers the supply and construction of two 417 MW, dual-fuel,
combined-cycle units with Alstom’s KA26 single-shaft configuration as well as
the associated civil works, balance of plant, distributed control system (DCS) and
switchyard equipment to connect the power station to the grid.
In addition Alstom was also awarded a 20-years O&M contract for full operation and
maintenance of the two gas-fired combined-cycle units. This contract will ensure that
the plant generates electricity at high efficiency and reliability levels, thus significantly
improving the market fuel utilisation and security of electricity supply.
The Israeli government is encouraging investments by IPPs (Independent Power
Producers), and the recent discoveries of major gas reserves near the Israeli coasts are
likely to encourage investment in gas-fired combined-cycle power stations.
ADVANTAGES
TPWR/CASE/HI/EN/2.2014/CHE/2002
•tProminent operational
Customer:...................................... Dalia Power Energies Ltd.
Scope of supply:............................
EPC turnkey contract for 2 x KA26-1 SS units
+ 20-years O&M contract
Electrical output:........................... 834 MW
Fuel:............................................... Natural gas / Fuel oil as backup
Cooling System:............................. Air-cooled condenser (ACC)
Application:.................................... Power generation
and fuel flexibility
•tHigh reliability
•tSuperior part-load
performance
•tLow NOx emissions over
a wide load range
With its environmental and
economic advantages, this
plant is another example of
Alstom’s capability to deliver
clean integrated power
solutions
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it
is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is
subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.