تماس با ما
وب سایت در حال به روز رسانی است. از شکیبایی شما سپاسگزار هستیم.

منابع یابی و خرید تجهیزات صنعتی

محصولات
محصولات
سازندگان
کاتالوگ
فیلم

 (ویژه صنایع و کارخانجات )

خدمات خرید ، حمل ، ثبت  سفارش ، ترخیص و تحویل هر گونه کالای صنعتی از اروپا ، چین ، ترکیه  و امارات متحده عربی
لطفا جهت خرید ، حمل ، ترخیص و تحویل هر گونه کالای صنعتی در هر نقطه از دنیا با ما در تماس باشید .
ایمیل sales@meshgad.com

تماس : ۸۸۸۷۱۸۰۸ - ۸۸۸۷۱۸۷۵ - ۸۸۶۵۶۴۷۱

  • 1
  • 2
  • 3
  • 4
  • 6
LOADING

PRESSURE BOOSTER0 pages

نسخه متنی
"

Air Service Units

nnnn

Pressure booster

nnnn

Series 1700

nnnn

PMEUMAX

nnnn

GENERAL

nnnn

It is not unusual that, during some applications the thrust generated by a pneumatic cylinder is not sufficient

nnnn

for the specific purpose it has been designed for.

nnnn

In order to get over the problem, the working pressure may be increased to a maximum line pressure which

nnnn

normally is 6 - 7 bar; alternatively the problem is solved by an higher bore cylinder that suits the machine.

nnnn

Three size pressure boosters, with pressure ratio of 1 - 2, have been designed to avoid these problems. This

nnnn

device is utilizing the compressed air of the circuit where it is installed.

nnnn

CHAMBER 2 IN CHAMBER 3

nnnn

--\-------------9

nnnn

CONSTRUCTION AND WORKING CHARACTERISTICS

nnnn

The working method is based on the pump effect of the four

nnnn

chambers cylinder as shown in fig. 1. Two chambers are alternatively

nnnn

compressing the air in the boost one, while the fourth one is

nnnn

discharging.

nnnn

By means of an internal circuit, the pressure booster keeps on

nnnn

pumping air till the down stream pressure reaches a value double the

nnnn

inlet pressure.

nnnn

In these circumstances there is a balance condition.

nnnn

When the down stream pressure decreases, the pressure booster starts again its alternating cycle till a new

nnnn

balance condition is restored.

nnnn

The pressure booster can be furnished complete with pressure regulator installed on the inlet port for getting

nnnn

an accurate outlet pressure value. A wall mounting plate is also available.

nnnn

INSTRUCTIONS FOR INSTALLATION AND USE

nnnn

Do not exceed the suggested temperature and pressure values.

nnnn

It is advisable to install a small air tank after the pressure booster to avoid pressure pulsation effects.

nnnn

Discharge the down stream circuit before any maintenance operation as the inner circuit of the booster does

nnnn

not allow the down stream line discharge even if the inlet pressure drops down.

nnnn

MAINTENANCE

nnnn

Pressure booster has an average life of about 20 millions of valve cycles, depending on working conditions

nnnn

(every back stroke corresponds to one valve cycles ).

nnnn

A proper lubrication and filtration of air improve the life of pressure booster parts.

nnnn

It is advisable to protect the exhaust ports in environment.

nnnn

Replaceable spare seal kits are available.

nnnn

Filing time curve of 10 liters tank

nnnn

HOW TO CALCULATE THE REQUIRED TIME OF PRESSURE BOOSTER TO INCREASE THE AIR PRESSURE

nnnn

IN ATANKWHOSE CAPACITY IS KNOWN.

nnnn

Operating Data :

nnnn

P1 = Inlet pressure

nnnn

P2'=Tank initial pressure

nnnn

P2" = Tank final pressure

nnnn

V = Tank volume

nnnn

PROCEDURE:

nnnn

1 ) Calculate the ratio K' between the initial pressure of the tank and the

nnnn

inlet pressure of the booster ( P27 P1 ).

nnnn

2) Calculate the ratio K" between the final pressure of the tank and the

nnnn

inlet pressure of the booster (P2"/P1 ).

nnnn

3) Locate the intersection point between the ratio K' and the curve on

nnnn

filling time diagram related to the specific booster.

nnnn

Trace a vertical line from the above point and read the correspondent

nnnn

time T' ( the example shows the ratio K = 0.8 and correspondent time of

nnnn

about 4.2seconds).

nnnn

4) Repeat same procedure also for ratio K" to get time T".

nnnn

5) Use the following formula T=Y.. (T"-T)

nnnn

P1 :

nnnn

P2:

nnnn

24 30

nnnn

time (sec.)

nnnn

inlet pressure

nnnn

tank pressure

nnnn

to obtain the total time required to move the pressure P2' to P2" of tank

nnnn

volume V.

"

IRAN INDUSTRY EXPO

The largest online Industrial exhibition in Iran

 عضویت ورود   ENGLISH


اگر مجموعه شما جزو صنایع مادر و معظم در فیلد پالایشگاه ، پتروشیمی ، حفاری ، نیروگاه ، معادن و فلزات ، خودروسازی ، تولید مواد غذایی و.... می باشد لطفا درخواست خود را بر روی سربرگ به فاکس 88206264 و یا ایمیل enquiry@iranindustryexpo.com بنام شرکت مهندسی و بازرگانی مشگاد ارسال فرمایید.
اگر مجموعه شما جزو بنگاه های متوسط و کوچک در فیلد تولید ، بازرگانی ، مشاوره ، پیمانکاری ، دانشگاه ، پژوهشگاه ، توزیع ، فروشگاهی وکارگاهی می باشد ، پس از عضویت و با پرداخت هزینه ( به ازای هر درخواست معادل 50 یورو ) از خدمات زیر برخوردار خواهید شد :
  • پاسخ به پرسش های فنی و دریافت مشاوره از سازنده ، دریافت کاتالوگ و اطلاعات تکمیلی
  • دريافت پرفورما از شرکت سازنده
  • اطلاع از زمان تحويل و قيمت خالص كالا
  • اطلاع از هزينه هاي حمل و ترخيص و کارمزد تا تحويل كالا به انبار شما در هر نقطه از كشور
  • دریافت پیش فاکتوررسمی ( ارزی و یا ریالی ) به روش کارمزدی
*صدور پیش فاکتور رسمی فقط به نام شرکتهای ثبت شده که دارای کد بازرگانی معتبر باشند انجام پذیر است. در صورتیکه در حین مکاتبه با شرکت سازنده مشخص شود که دارای نماینده انحصاری و یا شعبه در ایران بوده و یا به به هر دلیل شرکت سازنده از فروش کالا به بازار ایران استنکاف نماید ارایه این سرویس متوقف و وجه دریافتی به حساب کاربر عودت می شود

ادامه