GE10-1 Gas Turbine0 pages
Fuel Gas System
A typical gas fuel configuration
employs shutoff valves for
safety reasons and metering
valves to control the machine
load and CO/NOx emissions.
Depending on the level of DLN
performance requested, two
or three metering valves are
needed in order to control gas
injection in the various parts
of the combustion chamber.
operation of the unit is
supplied, including:
• Unit control panel
(on GT skid)
• Motor control center
(on GT skid)
• VFD for gas turbine
starting
• Generator control and
protection panel
• DC panel & battery charger
Unit Control Panel
The GE10 control system is
standardized to assure a high
degree of integration
between the turbine and the
generator. The system is
based on the GE Fanuc RX3i
PAC System platform with
remote I/O modules.
The Bently Nevada 1701 is
installed for the acquisition of
data from seismic probes and
for humming detection. The
control, monitoring and tuning
of unit parameters can be
performed remotely. Remote
data acquisition does not
interfere with normal site
operations.
Control CAB
An integrated control cab
containing all electrical
panels for control and
5.4 m
• Batteries
• On site monitoring system
The cab is provided with an
air conditioning system,
normal and emergency
lighting, a smoke detection
system and manual fire
suppression bottles.
Air Filter
The air filtration system
consists of a self-clearing
vertical cartridges filter house,
an inlet duct and a silencer.
This system also provides an
anti-icing function without
any additional hardware.
Filter inspection and
replacement of filter cartridges
are facilitated by gangways
and ladders that are included
as part of the scope of supply.
12.6 m
6m
Package Arrangement
The gas turbine enclosure
consists of a separate
structure and panels mounted
on a base plate. Access doors
are included for normal
maintenance operations and
inspections. The ventilation
system for internal cooling of
the package consists of two
100% axial fans.
The enclosure includes fire &
gas detection systems and an
automatic CO2 -type fire
fighting system.
The enclosure guarantees a
sound pressure level lower
than 85 dBA at 1 m.
An 80 dBA version is available
upon request.
The GE10-1 package is
designed specifically for
power generation applications
and is optimized to minimize
plant dimensions and to
reduce maintenance cost and
time.
The single lift architecture
minimizes the site installation
and commissioning lead time.
The integrated control cab
eliminates civil works for the
control room and site wiring
activities.
Available Options
• Dual Fuel DLN version
(liquid + gas fuel)
• 6.0 kV Electric Generator
• 80 dBA sound pressure
level package
• Indoor version
• H2O oil cooler
• STD exhaust duct (12 m)
• Lubrication stand-by pump
• Control cabinet located
alongside the unit
• Additional Pre-Engineered
BN1701 for complete
vibration monitoring