MevaDec FTE-Method0 pages
▲meva
nnnnProduct nfo
nnnnMevaDec FTE-Method
nnnnMevaDec: The Formula 1 Slab Formwork
nnnnThe Drop-Head-
nnnnBeam-Panel Method
nnnnThe MevaDec Drop-Head-Beam-Panel
nnnnmethod works with primary beams on
nnnnwhich the formwork panels slide in.
nnnnThe patented MEVA drop-head allows
nnnnfor early stripping of primary beams
nnnnand panels.
nnnnThe number of props is determined by the
nnnnsystem, which means zero assembly error.
nnnnAssembly and stripping are very fast and
nnnnsimple. Early stripping and fast cycling of
nnnnformwork leads to a reduction in inventory
nnnnof up to 40 %, simplifying logistics and
nnnnmanpower and reducing costs accordingly.
nnnnThis makes the MevaDec not only the
nnnnfastest, but most cost-effective slab solution
nnnnfor
nnnn■ many slab levels
nnnn■ similar geometries
nnnn■ many concrete pours
nnnn■ short, fast cycles
nnnnAdvantages
nnnn■ Covers all slabs up to 130 cm thickness
nnnn■ Fast assembly with only a few parts
nnnn■ Crane-independent
nnnn■ Early stripping with patented drop-head
nnnn■ Number of props determined by system
nnnn■ Compensation areas minimised
nnnn■ No fixed grid; direction changeable
nnnn■ Labour-effective, low cost
nnnnin' 'a
nnnnm
nnnnm
nnnnmm. m
nnnn▲ No fixed grid: adaptation to any building layout is flexible and easy. Assembly is quick, easy, error-free
nnnnand requires only a few workers, reducing labour costs. The panels slide in onto the primary beam and
nnnncan be moved beyond the drop-head. Compensation areas are formed using secondary beams within
nnnnthe same system, on which a separate facing sheet is placed. T The direction of forming can be changed
nnnnto adapt to any layout, minimising compensation or filler areas and saving labour, material and costs.
nnnnThe panel facing is a 100 % wood-free, all-plastic facing that never needs to be replaced and delivers a
nnnnsuperior concrete finish first time, every time.
"