BHP0 pages
www.outinord.fr
BHP
HIGH PRESSURE WALL FORM
● Increase of cementing speeds
● More resistance to concrete pressure
● Productivity improvement on high
building sites
● Optimal safety level
AT THE SETTING
Because of its high resistance to concrete
pressures, up to 15 t/m², the HPB helps reduce
by 50% the concrete setting time;
i.e. a productivity gain of 20% per formwork 1/2
cycle.
DURING THE HANDLING
The HPB provides reinforced lifting rings, of
3,850t capacity, which can move quickly 42m²
sets with only two lifting points.
Parcels of 12,20m high and 2,50m wide or
12,50m wide and 3,30m high are moved with a
single handling; Therefore a productivity gain by
the abolition of decoupling, configuration
phases and the abolition of the employment of
swingletrees.
Height of the formwork in m.
Hauteur du coffrage en m.
AT THE IMPLEMENTATION
The HPB limits assembly operations since is only
equipped with two SMABs, ergonomic accesses on
2,80m height; i.e. a gain of over 30% during the
coupling and decoupling of the wall forms.
15
10°
15°
20°
14
12
10
8
6
4
2
0
0
1
2
3
4
5
6
7
8
NO CONTRACTUAL DOCUMENT
Vitesse de montée m/h
Ascent speed inen m/h
Outinord s.a. BP 99, 59732 St Amand-les-Eaux Cedex, FRANCE
Tél. : + 333 27 23 83 83, Fax. : + 333 27 23 83 55, outinord@outinord.fr